Friday, September 02, 2005

29' Dome Bonus East Side Extension


East Side Door Addition Now Painted with ACRYLINK G Posted by Picasa

60' Dome SuperWall Strut Production


Triangles in Foreground with Pile of Struts with Sleeves Posted by Picasa

60' Dome SuperWall Strut Production


Jig to Fabricate SuperWall Double Struts
2x8 and 2x4 joined by gussets
from Triangle Scrap Posted by Picasa

60' Dome Triangles Transport


JJ Loading Triangles for transport to dome site Posted by Picasa

60' Dome Floor Support Pentagon: Celtic Kiva


Deep and Wide Enough the
Celtic Keva - aka Cellar Hole
Requires Fine Trim with the Back Hoe Posted by Picasa

60' Dome Floor Support Pentagon: Celtic Kiva


Celtic Kivi with Mnt Gunnison
Highlighted by Setting Sun
Ramp at Left will Direct
Final Sun Light from Winter Solstice
to Center Cellar Hole Posted by Picasa

60' Dome Triangles Prep Acrylinking


Additional Triangle Processing Site
Less Transport is Better
Tractor "Shop" in Foreground  Posted by Picasa

60' Dome Triangles Prep Acrylinking


Final Processing of Triangles - Caulked and Painted Star Tetrahedran Piles Posted by Picasa

60' Dome SuperWall Strut Production


Completed Struts Awaiting Transport of Gerry's Shop to 60' Dome Site Posted by Picasa

60' Dome SuperWall Strut Transport


Chaiah and Bounty Riding Struts to Strut Casche Posted by Picasa

60' Dome SuperWall Strut Cache


Chaiah and Maazo Unloading Struts at SW Corner of the Bounty Corral - Strut Casche  Posted by Picasa

60' Dome SuperWall Strut Cache


Chaiah and Maazo Unloading More Struts at
the SuperWall Strut Casche Posted by Picasa

60' Dome Raising Broken Back Hoe


Back Hoe Problems Continue
Weld of Bolted Connection Weakens Support
Now Bent Beyond Use  Posted by Picasa

60' Dome SuperWall Strut Cache


Struts with Pile of Hubs and Bolts Posted by Picasa

60' Dome Floor Support Pentagon: Celtic Kiva


Commencing Footers for Celtic Kiva Posted by Picasa

60' Dome Floor Support Pentagon: Celtic Kiva


View of Ramp down into Celtic Keva  Posted by Picasa

60' Dome Foundation Excavation


Excavation for 60' Dome
with 30' Diameter Cellar aka Celtic Kiva
Building at top right is where dome components were fabricated
 Posted by Picasa

Thursday, September 01, 2005

60' Dome Triangles Prep Acrylinking


Forms for Footers and Stem Walls in Foreground. Triangle Processing in Immediate Rear
 Posted by Picasa

60' Dome SuperWall Struts


60' Dome SuperWall Struts Completed Posted by Picasa

60' Dome Floor Support Pentagon: Celtic Kiva


Pentagon Footer Forms for Celtic Kiva  Posted by Picasa

60' Dome Floor Support Pentagon: Celtic Kiva


Form for Floor Support Pillar 20050908 Posted by Picasa

60' Dome 20050909 Several Rain Storms


Storm Advancing from The South West Posted by Picasa

60' Dome 20050909 Several Rain Storms


Thunderstorm Advancing over Lamborn  Posted by Picasa

60' Dome 20050909 Several Rain Storms


Storm Has Passed and Lamborn is Aglow Posted by Picasa

60' Dome 20050909 Several Rain Storms


No Work Today With Water in the Hole 20050909 Posted by Picasa